Sri Lanka Power Cut Today (17 Aug 2020) Due To Transmission Failure.

Sri Lanka Power Cut Today

Just now a very big news is coming out in front of the us that the whole electricity has been cut in Sri Lanka.

sri lanka power cut today

Reason of Sri Lanka Power Cut?

Ceylon Electricity Board are saying that the cause of light failure in the whole Sri Lanka is due to big Transmission error

A technical issue at the Kerawalapitiya Grid Sub- Station was identified as the cause for the power failure.

Due to which the citizens of Sri Lanka are facing a lot of difficulties in eating, drinking and taking bath.

Advertisement

Time Taken To Restore Sri Lanka Power Cut?

It is being told by C.E.B (Ceylon Electricity Board) that the light will come back all over Sri Lanka within 2 hours.

The entire electrical team is engaged in resolving this major crisis.

Also Check This Post

Advertisement

Related posts

Leave a Comment